Monday 23 November

Send us your video Advertise
Sign in Join free

NERC approves ₦30bn for free meters for Band A and B customers, sets May 2027 deadline

NERC has approved ₦30 billion to meter every unmetered Band A customer and speed up Band B meters, free of charge, with installations due by 31 May 2027. What the order says.

By John Christian Mmaduabuchi, Chief Editor

· 3 min read · Abuja

  1. NERC has approved ₦30 billion under Tranche C of the Meter Acquisition Fund, in an order that took effect on 2 November 2026 and was announced on Tuesday, 10 November.
  2. The money is meant to meter all remaining unmetered Band A customers and speed up meters for Band B customers, free of charge.
  3. All installations under the order must be completed on or before 31 May 2027, and suppliers get the last 30% of their pay only after installation is confirmed.
Gist Reel
Photo: Yellowcrunchy / Wikimedia Commons (CC BY-SA 4.0)
Read it your way
Save

The gist in 30 seconds

  • NERC has approved ₦30 billion under Tranche C of the Meter Acquisition Fund, in an order that took effect on 2 November 2026 and was announced on Tuesday, 10 November.
  • The money is meant to meter all remaining unmetered Band A customers and speed up meters for Band B customers, free of charge.
  • All installations under the order must be completed on or before 31 May 2027, and suppliers get the last 30% of their pay only after installation is confirmed.

The Nigerian Electricity Regulatory Commission (NERC) has approved ₦30 billion for free electricity meters to meter every remaining unmetered Band A customer and speed up meters for Band B customers, and has told distribution companies (DisCos) to finish the installations by 31 May 2027.

The money is the third tranche, Tranche C, of the Meter Acquisition Fund (MAF) under the Presidential Metering Initiative. NERC set out the rules in Order No. NERC/2026/121, which took effect on 2 November 2026, and announced it in a statement on Tuesday, 10 November.

Why it matters

Band A customers pay the highest tariff in return for NERC’s requirement of at least 20 hours of supply a day on average. Customers without a meter are billed on estimates, a long-running source of complaints, and the order comes after weeks of blackouts for which the DisCos apologised on Monday, 9 November (what Band A customers are owed).

NERC said the funding is intended “to meter all remaining unmetered Band A customers and accelerate the metering of Band B customers”.

What the order says

  • Who gets the money: the ₦30 billion is shared among the 11 DisCos in proportion to what each has paid into the fund, and the meters must be spread fairly across the states in each DisCo’s area.
  • Who supplies the meters: DisCos must run transparent procurement among eligible Local Meter Manufacturers and Assemblers (LMMAs) and Meter Asset Providers (MAPs) that have verified meter stock.
  • Price caps: NERC has set maximum prices based on the median national MAP online bid prices from the September 2026 bid cycle.
  • Pay on results: suppliers get 70% after verified delivery of the meters and the remaining 30% only once NERC confirms installation is complete.
  • Checks: every supply and installation contract must be filed with NERC, the fund manager, DisCos and suppliers must report on progress, and DisCos face sanctions if their default holds up installation.

Do customers pay anything?

No. “The Commission reiterates that all meters supplied and installed under the MAF programme shall be provided FREE OF CHARGE to customers,” NERC said in its statement.

Every meter must show the DisCo’s name, the MAF tranche and the words “NOT FOR SALE”. If a DisCo moves a customer’s connection point for revenue protection, the DisCo bears the cost, NERC said.

That means no one should ask you to pay for a meter installed under this programme. Customers who are asked to pay, or whose installation stalls, can complain to their DisCo and, if the complaint is not resolved, to NERC.

What has NERC done on meters before?

In March 2026, NERC also ordered all DisCos to refund ₦20.33 billion to customers who had paid for meters under the MAP scheme, Nairametrics reported at the time. Under the new order, the 70/30 payment split, the price caps and the filed contracts are meant to ensure that suppliers are paid in full only for meters that are actually installed.

What happens next

  • Procurement: each DisCo must now choose suppliers and file the contracts with NERC.
  • Deadline: all Tranche C installations must be completed on or before Monday, 31 May 2027.
  • Enforcement: NERC says it will sanction DisCos whose default delays installation.

Are you a Band A or Band B customer still without a meter? Tell GistMatrix your DisCo and area, and whether anyone has asked you to pay. We will follow the rollout until the May 2027 deadline.

Sources

We checked this story against these sources. How we check

  1. Nigerian Electricity Regulatory Commission: NERC Issues Order on the Operationalisation of Meter Acquisition Fund (MAF) Tranche C (10 Nov 2026)
  2. Nairametrics: NERC approves N30 billion to provide free meters to Band A, Band B customers (10 Nov 2026)
  3. Peoples Gazette: NERC approves N30 billion to provide meters for electricity customers (10 Nov 2026)
  4. Nairametrics: NERC orders DisCos to fast-track N20.33 billion meter refunds (4 Mar 2026)

How does this story make you feel?

John Christian Mmaduabuchi Chief Editor

John Christian Mmaduabuchi is a Nigerian filmmaker, creative director, and media professional with extensive experience in digital storytelling, visual journalism, and contemporary media. His Journalism interests span Nigerian and African current affairs, entertainment, culture, technology, lifestyle, media, and the people shaping public conversation. With a background in film direction and documentary production, he brings a strong visual and narrative perspective to editorial work, with particular attention to context, clarity, and compelling storytelling. John is also a creative entrepreneur focused on storytelling, entertainment, culture, and digital content. His professional experience across directing, cinematography, editing, media strategy, and emerging AI technologies gives him a broad understanding of how stories are created, distributed, and consumed in the digital age. At GistMatrix, John contributes to the development and presentation of timely, engaging, and relevant stories for a contemporary audience. His approach to editorial work is grounded in accuracy, context, responsible storytelling, and a commitment to covering stories that matter.

Spotted a mistake? Tell us and we'll fix it in public.

Join the conversation

Be sharp, be kind. Comments are checked before they appear. We remove insults, hate, spam and personal details. Community rules

Add your gist

Your email is never shown. Comments appear once a moderator approves them.

The newsletter

Get the gist before everyone else.

A five-minute read on Monday, Wednesday and Friday at 7am. Free, and you can leave any time.